Mining Camp

Flat Pack Container Mining Camp — Western Australia

200-unit flat pack container mining camp accommodation delivered to Western Australia. Detachable design for bulk shipping, quick 4-hour assembly per unit. Full worker dormitory, mess hall, and office complex.

Pilbara, Western Australia

Location

3,200 m²

Area

2025

Year

30 days

Duration

Flat Pack Container Mining Camp — Western Australia
Flat Pack Container Mining Camp — Western Australia - View 2
Flat Pack Container Mining Camp — Western Australia - View 3

Project Overview

Delivered a complete 200-unit flat pack container mining camp to a major iron ore mining project in the Pilbara region of Western Australia. The camp includes 160 worker dormitory units (each housing 2-4 workers), 20 supervisor quarters, a 200-seat mess hall with commercial kitchen, 4 office blocks, a medical center, and recreational facilities. All units were shipped via 40HQ containers (6-8 units per container), reducing logistics costs by 40% compared to traditional modular buildings. The entire camp was assembled in 30 days by a 12-person crew — no crane required.

Key Features

1 200 flat pack container units: dormitories, offices, mess hall, medical center
2 40HQ container shipping — 6-8 units per container for maximum freight efficiency
3 3-4 person crew assembles each unit in 2-4 hours without crane
4 Double-layer insulation with anti-corrosion coating for Pilbara desert climate
5 Full MEP pre-installation: electrical, plumbing, HVAC, data cabling
6 Compliant with Australian AS 1170 structural standards
7 Expandable layout — camp can scale from 50 to 500+ beds

Technical Specs

Units 200 Flat Pack Containers
Capacity 640 Workers (160 Dormitories)
Unit Size 6055×2990×2896mm Per Unit
Assembly 30 Days (12-Person Crew)
Insulation 50mm Rock Wool + EPS Panel
Standards AS 1170 / ISO 9001

Interested in this project?

We can build a similar solution tailored to your needs. Contact our team for a free consultation.

Request a Quote

Ready to Build Yours?

Every project starts with a conversation. Tell us about your vision, and our engineering team will design a container house solution that fits your needs, budget, and timeline.