Prefab Labor Camp Dormitory — NEOM, Saudi Arabia
300-unit prefab flat pack labor camp dormitory supplied to Saudi Arabia NEOM infrastructure project. China factory direct supply with full EPC procurement support. Integrated office + canteen + laundry complex.
Location
NEOM, Saudi Arabia
Area
5,000 m²
Year
2025
Duration
45 days
Client
EPC Infrastructure Contractor
NEOM, Saudi Arabia
Location
5,000 m²
Area
2025
Year
45 days
Duration
Project Overview
As a China-based flat pack container house manufacturer, we supplied 300 prefabricated container dormitory units to a major EPC contractor working on the NEOM infrastructure development in Saudi Arabia. The labor camp complex includes 250 worker dormitories (4-person capacity each), 20 management suites, a 300-seat canteen with industrial kitchen, centralized laundry facilities, prayer rooms, and administrative offices. All units meet Saudi Building Code requirements with enhanced thermal insulation for extreme desert temperatures (50°C+). The project was completed on a tight 45-day timeline, with our team providing full on-site assembly supervision and after-sales support.
Key Features
Technical Specs
Interested in this project?
We can build a similar solution tailored to your needs. Contact our team for a free consultation.
Request a QuoteRelated Projects
Explore more of our container house installations
Ready to Build Yours?
Every project starts with a conversation. Tell us about your vision, and our engineering team will design a container house solution that fits your needs, budget, and timeline.